ease-assembly-4Due to the lightweight nature of the structural elements, assembly and erection is simple and straightforward.

All the columns and beams are predrilled during manufacture to ensure ease of assembly.

An installation guide sets out  clearly how the different elements are bolted together.

Heavy lifting equipment is not normally required  during erection. Lightweight scaffold towers may be necessary depending on the height of the building.

All the bolted connections at the ridge, eaves and baseplates use M12 bolts so few tools are required. A battery powered impact drill would be of benefit but is not essential.